Skip to content

Posts Tagged: Hose Lays

The Long Stretch and Push

When looking at this type of building we need to consider the construction type, occupancy, access and egress points and any special hazards. What are our initial resources and what should we have coming on the way? This building is four stories and is a dormartory at a college. The corridor length is 225 from stairwell to stairwell. As you look at the building in the picture, the stairwell on the right is more remote from a parking surface than the one on the left. Read More »

Hose Deployment

We have to remember that the atypical fire requires atypical tactics in some cases and the norm of pulling a 1 3/4 inch cross lay or speed load just isn't going to get it done. Read More »

Featuring WPMU Bloglist Widget by YD WordPress Developer

Better Tag Cloud